Mr. Tim Cummings, It has come to my attention and the attention of many other residents that there will be a large amount of money that is not included in the initial Performing Arts Center bond to pay for all the exclusions.


We want to thank Laura Colquhoun for this Op-Ed. If you have an Op-Ed or LTE
you want us to consider, please submit it to skip@ or steve@granitegrok.com.


As you have stated, the exclusion listing will be purchased separately, however, you have not given an estimated price tag on all these separate items. You did supply Aldermen Lu with an additional cost of $2,300,000 however that figure only showed a few items and not all.

I am therefore requesting that you supply me with a complete listing of all exclusions with the estimated cost of each item (please see below). I realize that some of the items will be an income lost to the Nashua taxpayers while others be will a direct expense to Nashua taxpayers.  It is very important that the Nashua taxpayers see both the loss of income and the actual expenses that the taxpayers will have to pay.

Exclusions for the PAC

Design Contingency

$0

Winter Concrete or Masonry

$0

Purchasing Construction parking spaces

$0

Clerk’s Office

$0

Unsuitable soils

$0

Lightweight or Architectural Concrete

$0

Isolated concrete floating floor

$0

DBA System – The top responsibility of a DBA professional is to maintain data integrity.

$0

Monitored Fire Extinguishers

$0

Fire Watch/Temp Fire Pump

$0

Security Watch

$0

Work stoppage for archeological findings

$0

$0

Recent Tariffs

$0

Construction Testing, Air Quality Testing

$0

Sidewalk closure fee, sidewalk encumbrance fee

$0

LEED Certification – Leadership in Energy and Environmental Design is a green building certification

$0

Municipal Impact /Connection Fees

$0

Sewer Impact Fees

$0

Water Meter Fees

$0

Geotechnical Services and Monitoring Fees

$0

Industrial Hygienist Fees

$0

Electronic Documents Fees

$0

Commissioning Agent Fees

$0

Cost associated with Eversoure or National Grid rebate program

$0

Cost to dispose contaminated ground water

$0

Removal of Ledge and boulders over 2 cy in size

$0

Cost to remove and dispose of any hazardous materials found in ground

$0

Termite Control

$0

Building Permit Fees

$0

Electrical Power Consumption Cost

$0

Sales  Tax

$0

Gas Consumption Cost

$0

Water Consumption Cost

$0

Cost Associated with Special Inspections

$0

$0

Purchase CADD Files – software

$0

Architectural as built in CADD

$0

Design Services

$0

Wood Plaza Decking

$0

Roof Dalits

$0

Overhead coiling grilles

$0

Metal framed skylight

$0

Exterior Lighted Poster cases

$0

Lath & Plaster

$0

Acoustic Ceiling Tile & Grid

$0

Vertical acoustic operable panels

$0

Blueprint matched wood paneling

$0

Demountable trap stage floor

$0

Glass Shower Enclosures

$0

Wall Coverings

$0

Grouting or reinforcement of existing masonry

$0

Painted wood base. All base is resilient or tile

$0

Painted concrete

$0

Exterior Paint other that 4-sotry aluminum window frames, HM exterior doors and frames and painted terrace rails

$0

Foundation demolition at the 2-story building

$0

SSPA6 AESS Prep

$0

F.F.& E. – unloading, uncrating, disposal of crating and installation

$0

Special Coatings

$0

Exhaust Fan & Piping for Radon

$0

Lightning Protection System

$672,570

Level 5 Finish – Level 5 Level 5 finish is recommended for areas where severe lighting conditions exist and areas that are to receive gloss, semi-gloss, enamel or non-textured flat paints.

$0

Roof screens for mechanical equipment

$0

Roof Railings

$0

Spray on Fireproofing

$0

Engineered Dewatering System

$0

$672,570

Banquet tables or chairs/moveable furniture

$78,366

Owners furniture

$876,100

Residential appliances

$80,433

Room Clocks, WAP’s, Computer, Switches and Patch Cords

$0

Phone System

$0

Projectors

$582,000

Security Cameras and Card Readers

$53,960

Intercom System

$0

$1,670,859

Total Expenses

$2,343,429